Optimising energy performance across an airport site
Comprehensive energy assessments spanning Air Traffic Control, the terminal building and support structures.
CSR Sustain was instructed to lead on improving energy efficiency at Liverpool John Lennon Airport, conducting comprehensive energy assessments across the entire site.
Client: Liverpool John Lennon Airport · Location: Liverpool
- A phased assessment approach covering each building category
- Delivery scheduled around live airport operations
How the programme ran
Site-wide energy assessment
Assessments covering critical areas including Air Traffic Control, the terminal building and support structures.
Ongoing support
Continued support for the airport on its route toward energy excellence.
What made this difficult
Operationally critical estate
Plant running outside occupancy schedules, with control settings drifting through seasonal change and manual overrides.
Diverse building types
Plant running outside occupancy schedules, with control settings drifting through seasonal change and manual overrides.
The outcome
RThe contract was delivered on time and within budget, establishing the baseline for continued energy improvement across the site.
Lessons
- Complex operational sites need assessment programmes built around access windows
